Built

Wheat Montana

Led operations for 400 personnel and implemented machine vision systems that reduced waste and saved approximately $500K annually.

Wheat Montana logo

Built

Assistant Plant Manager

What Gordon did

Led day to day execution across staffing, process, output, and maintenance constraints.

Implemented machine vision systems where visual inspection and waste created measurable operating cost.

Connected the technical system to plant behavior so the improvement held up in production.

What was hard

A plant improvement has to survive variation in material, equipment, staffing, and production pace.

The technology had to fit an operating system with real consequences for downtime and output.

Savings depended on adoption and repeatability, not a successful demonstration alone.

Proof at a glance

~$500K/yr

Estimated savings

Approximate annual waste reduction attributed to the implemented machine vision systems.

400

Personnel scope

Plant scale operating responsibility across a large workforce and production environment.

  • Reduced waste and saved approximately $500K annually.
  • Led plant scale operations across people, process, and throughput constraints.
  • Adds serious operating depth underneath the later founder and AI work.